İSKİ Drinking Water Tunnel Construction (Zeytinburnu–Bahçelievler)

This major infrastructure project between Zeytinburnu and Bahçelievler is Türkiye’s first drinking-water tunnel excavated with a domestically manufactured TBM, with 95% local content. The 3,087-metre route carries Ø2,000 mm high-strength welded steel pipes and uses continuous precast segmental lining to prevent ground settlement and deformation. It delivers water from Ömerli Dam to the European side reliably and at high pressure.

Engineering Scope & Project Story

This major infrastructure project between Zeytinburnu and Bahçelievler is Türkiye’s first drinking-water tunnel excavated with a domestically manufactured TBM, with 95% local content. The 3,087-metre route carries Ø2,000 mm high-strength welded steel pipes and uses continuous precast segmental lining to prevent ground settlement and deformation. It delivers water from Ömerli Dam to the European side reliably and at high pressure.

Advanced Safety & Occupational Health

A zero-accident policy aligned with ISO 45001 and continuous gas-monitoring systems.

Modern Technology

Laser-guided TBM steering, hydraulic injection and high-strength reinforced-concrete solutions.

Environment & Sustainability

Zero-settlement excavation methods that protect groundwater conditions and the urban fabric.

Contract & Technical Parameters

Employer / Authority
İSKİ General Directorate
Project Location
Zeytinburnu, Istanbul
Sector
Infrastructure
Contract Model
Design-Build, Turnkey
Project Status
Completed Project
Completion / Handover
December 2015, December 2020
Project Period
December 2015, December 2020
Tunnel Length
3,087 m