Dil Seçimi / Select Language
Home Corporate Business Sectors Projects Press & Media Careers Contact
+90 (0212) 213 30 30
Get in Touch
Infrastructure & Tunnelling

İTÜ-Ayazağa Metro Station Pedestrian Tunnel

A convenient pedestrian tunnel directly connecting the RAMS Beyond complex in Maslak to the İTÜ-Ayazağa station on the M2 Yenikapı–Hacıosman metro line beneath busy Büyükdere Avenue, without interrupting road or pedestrian traffic. NATM excavation and jet-grout ground consolidation protect underground utilities with millimetre precision. The tunnel includes full climate control, moving walkways and accessible routes.

Engineering Scope & Project Story

A convenient pedestrian tunnel directly connecting the RAMS Beyond complex in Maslak to the İTÜ-Ayazağa station on the M2 Yenikapı–Hacıosman metro line beneath busy Büyükdere Avenue, without interrupting road or pedestrian traffic. NATM excavation and jet-grout ground consolidation protect underground utilities with millimetre precision. The tunnel includes full climate control, moving walkways and accessible routes.

Advanced Safety & Occupational Health

A zero-accident policy aligned with ISO 45001 and continuous gas-monitoring systems.

Modern Technology

Laser-guided TBM steering, hydraulic injection and high-strength reinforced-concrete solutions.

Environment & Sustainability

Zero-settlement excavation methods that protect groundwater conditions and the urban fabric.

Contract & Technical Parameters

Employer / Authority
Istanbul Metropolitan Municipality / RAMS
Project Location
Istanbul/Maslak
Sector
Infrastructure
Contract Model
Design-Build, Turnkey
Project Status
Ongoing Project
Completion / Handover
2024